Condor Gold Plc 34.1 Metres True Width at 2.56 g/t Gold From Near Surface Within La India Open Pit.

Alleen voor leden beschikbaar, wordt daarom gratis lid!

Overig advies 23/05/2022 11:17
Condor Gold (AIM: CNR; TSX: COG) is pleased to announce significant assay results from the sampling of geotechnical drill holes on the La India Open Pit. These intercepts are located within and between the planned high-grade starter pits and provide additional confidence to the mineral resource in this key area.
Highlights:
• 34.1 m true width at 2.56 g/t gold amalgamated from 2.80 m drill depth including 6.0 m at 4.3 g/t gold, 2.0 m at 5.3 g/t gold and 3.65m at 8.75g/t gold (drill hole LIGT536), located within the planned Northern Starter Pit.
• 28.7 m true width at 2.62 g/t gold in the hanging-wall of historic mine workings(drill hole LIGT528).
• 5.3 m true width at 3.11 g/t gold from 36.00 m drill depth, and 5.1 m true width at 2.70 g/t gold from 51.45 m drill depth in drill hole LIGT531; located in an area that has previously been interpreted as a low-grade zone between two high-grade shoots that host the planned starter pits.

Mark Child, Chairman and CEO commented:
“A wide zone of 34.1 metres true width of good open pit grade gold mineralisation of 2.56 g/t gold from only 2.80 metres drill depth is ideal material as initial mill feed for the permitted processing plant and
supports the attractive project economics and 12 month pay back detailed in the PEA technical report filed in October 2021. This was a geotechnical drill hole within La India open pit that was initially surveyed and analysed for structures and rock strength, which once completed, was assayed for gold and silver. It adds confidence to the geological model for the forthcoming Feasibility Study and serves as a timely reminder of the wide zones of material with good open pit gold grade available near surface within the fully permitted La India Project”.

Background
Condor announced the completion of 21 geotechnical drill holes on the planned La India Open Pit in an RNS dated 30th November 2021. The drilling was designed to provide drill core samples through all sides of the pit wall in order to collect geotechnical information to analyse and to determine the geotechnical parameters for the final pit design to a Feasibility Study (FS) level of detail, which is to plus or minus 15% accuracy. In all cases the drill holes were collared within the open pit shell and angled to pass through the pit wall at a pre-determined location in order to sample the rock mass that will eventually form the pit wall.

see & read more on
https://condorgold.com/sites/default/files/news/Condor_RNS_La%20India_Open_Pit_Drill_Result_34.1m%20at%202.56gt%20gold%20FINAL%20230522%20%28003%29.pdf



Beperkte weergave !
Leden hebben toegang tot meer informatie! Omdat u nog geen lid bent of niet staat ingelogd, ziet u nu een beperktere pagina. Wordt daarom GRATIS Lid of login met uw wachtwoord


Copyrights © 2000 by XEA.nl all rights reserved
Niets mag zonder toestemming van de redactie worden gekopieerd, linken naar deze pagina is wel toegestaan.


Copyrights © DEBELEGGERSADVISEUR.NL