Barrick On Track to Achieve 2024 Targets

Alleen voor leden beschikbaar, wordt daarom gratis lid!

Overig advies 19/04/2024 13:07
TORONTO – Barrick Gold Corporation (NYSE:GOLD)(TSX:ABX) ("Barrick" or the "Company") today reported preliminary Q1 production of 940 thousand ounces of gold and 40 thousand tonnes of copper, as well as preliminary Q1 sales of 910 thousand ounces of gold and 39 thousand tonnes of copper. As previously guided, Barrick’s gold and copper production in 2024 is expected to progressively increase each quarter through the year, with the Pueblo Viejo plant expansion ramping up from Q2 and the Porgera mine restart continuing in line with plans. We remain on track to achieve our full year gold and copper guidance.

The average market price for gold in Q1 was $2,070 per ounce while the average market price for copper in Q1 was $3.83 per pound.

As planned, preliminary Q1 gold production was lower than Q4 2023 mainly as a result of planned maintenance at Nevada Gold Mines and mine sequencing at various sites. In line with our plans, as a result of the lower production, Q1 gold cost of sales per ounce1 is expected to be 4% to 6% higher, total cash costs per ounce2 are expected to be 6% to 8% higher, and all-in sustaining costs per ounce2 are expected to be 7% to 9% higher compared to Q4 2023. Costs are expected to drop in the successive quarters of the year as production ramps up.

Preliminary Q1 copper production was lower than Q4 2023, driven primarily by lower grades mined at Lumwana in accordance with the mine plan. Compared to Q4 2023, driven by the lower production and in line with plans, Q1 copper cost of sales per pound1 is expected to be 9% to 11% higher, C1 cash costs per pound2 are expected to be 10% to 12% higher, while all-in sustaining costs per pound2 are expected to be 14% to 16% higher. Costs are expected to drop in the successive quarters of the year as production ramps up.

Barrick will provide additional discussion and analysis regarding its first quarter 2024 production and sales when the Company reports its quarterly results before North American markets open on May 1, 2024.

The following table includes preliminary gold and copper production and sales results from Barrick's operations:

Three months ended
March 31, 2024
Production Sales
Gold (attributable ounces (000))
Carlin (61.5%) 205 207
Cortez (61.5%) 119 121
Turquoise Ridge (61.5%) 62 62
Phoenix (61.5%) 34 34
Nevada Gold Mines (61.5%) 420 424
Loulo-Gounkoto (80%) 141 140
Pueblo Viejo (60%) 81 82
Kibali (45%) 76 72
Veladero (50%) 57 33
North Mara (84%) 46 46
Bulyanhulu (84%) 42 40
Hemlo 37 38
Tongon (89.7%) 36 35
Porgera (24.5%) 4 0
Total Gold 940 910
Copper (attributable tonnes (000))
Lumwana 22 22
Zaldívar (50%) 9 9
Jabal Sayid (50%) 9 8
Total Copper 40 39
First Quarter 2024 Results
Barrick will release its Q1 2024 results before market open on May 1, 2024. President and CEO Mark Bristow will host a live presentation of the results that day at 11:00 EDT, with an interactive webinar linked to a conference call. Participants will be able to ask questions.

Go to the webinar
US and Canada (toll-free) 1 844 763 8274
UK (toll) +44 20 3795 9972
International (toll) +1 647 484 8814

The Q1 2024 presentation materials will be available on Barrick’s website at www.barrick.com



Beperkte weergave !
Leden hebben toegang tot meer informatie! Omdat u nog geen lid bent of niet staat ingelogd, ziet u nu een beperktere pagina. Wordt daarom GRATIS Lid of login met uw wachtwoord


Copyrights © 2000 by XEA.nl all rights reserved
Niets mag zonder toestemming van de redactie worden gekopieerd, linken naar deze pagina is wel toegestaan.


Copyrights © DEBELEGGERSADVISEUR.NL